Maintenance Mondays – Drive Lanes Removed & Replaced

Maintenance Mondays: This project was for a Medical Building. This required the crew from Calvac Paving to work on a Sunday to minimize disruption. The bulk of the drive lanes were damaged to the extent that we had to remove and replace approximately 45% of the drive lanes. The crew completed approximately 260 tons of removal and replaced with 260 tons of hotmix asphalt. All of the removed asphalt was hauled to a recycle plant. Our crews were completed and out of our yard and on their way home by 6:30pm.
Calvac Paving – Top Quality. On Schedule. On Budget.